Early access

What is an ESPD in public procurement?

What the European Single Procurement Document is, what it contains, when you need more than one, and who provides the certificates.

The ESPD, or European Single Procurement Document, is a self-declaration in which a company states that it is not excluded from a tender and that it meets the selection criteria. Buyers in procedures under Directive 2014/24/EU must accept it as preliminary evidence in place of certificates, and normally only the winning tenderer then provides the supporting documents, before the award.

The rules are in Article 59 of the directive, and the standard form in Commission Implementing Regulation (EU) 2016/7.

What is in the ESPD?

  1. Part I: the procedure and the buyer.
  2. Part II: the company.
  3. Part III: exclusion grounds.
  4. Part IV: selection criteria.
  5. Part V: reducing the number of qualified candidates.
  6. Part VI: concluding statements.

When do you need more than one ESPD?

  • Relying on another company's capacity: your own ESPD and a separate one for each company you rely on.
  • Bidding as a group, such as a consortium: a separate ESPD for each member, covering Parts II to V.
  • Lots with different selection criteria: one for each lot, or for each group of lots with the same criteria.

For subcontractors whose capacity you do not rely on, the buyer says whether you must give their details.

How do you fill one in?

Electronically: the directive requires the ESPD in electronic form only. The Commission turned off its own ESPD service on 2 May 2019, and almost all EU countries now provide one or more national ESPD services. You may reuse an ESPD from an earlier procedure, as long as the information is still correct and pertinent.

The buyer may ask any tenderer for the supporting documents at any moment, so have the proof behind every answer ready before you submit.

The directive, and so the ESPD, applies above the EU thresholds. Check exclusion grounds and selection criteria early (go or no-go questions), and browse the tender directory.

Questions and answers

Is the ESPD still used?

Yes. The Commission states that the obligation to use the ESPD remains in force, through national services.

Who provides the certificates?

Generally the tenderer the buyer intends to award the contract to, before the award. The buyer may ask any tenderer for them earlier.

Can I reuse an ESPD?

Yes, if the information is still correct and pertinent.

Where can I see which documents prove each answer?

In eCertis, the Commission's service that lists the supporting documents.

Sources
  1. Directive 2014/24/EU on public procurement: Article 4 (thresholds) and Article 59 (European Single Procurement Document), checked 31 October 2026: https://eur-lex.europa.eu/eli/dir/2014/24/oj
  2. Commission Implementing Regulation (EU) 2016/7 of 5 January 2016 establishing the standard form for the European Single Procurement Document: Annex 1 (instructions) and Annex 2 (the form), checked 31 October 2026: https://eur-lex.europa.eu/eli/reg_impl/2016/7/oj
  3. European Commission, European Single Procurement Document and eCertis: the Commission's ESPD service turned off on 2 May 2019, national ESPD services and eCertis, checked 31 October 2026: https://single-market-economy.ec.europa.eu/single-market/public-procurement/digital-procurement/european-single-procurement-document-and-ecertis_en

The Herald, free each working morning. One tender analysed in depth, then big tickets, quick wins, deadlines and awards. Engineering and Water first.

Get the Herald

Read next