How to read a TED notice in five minutes
A contract notice holds most of what you need for a first go or no-go. Where to look, in what order, and what only the tender documents will tell you.
TED, short for Tenders Electronic Daily, is the online Supplement to the Official Journal of the EU, run by the EU's Publications Office. Public buyers in EU countries publish there when a contract is above the EU thresholds, and many buyers elsewhere in Europe publish there too. This morning 31,383 open tenders from TED and the UK's services are listed in the tender directory.
Since October 2023, notices on TED use eForms: standard digital forms that put the same facts in the same fields, whichever country the buyer is in. That makes a notice quick to read once you know where to look. Here is the order that answers the first question, whether this tender deserves more of your time, in about five minutes.
1. What kind of notice is it?
Check this first, because it decides whether there is anything to bid for.
- Contract notice: a call for competition. You can bid, or ask to take part.
- Prior information notice: an advance warning that a tender is coming. Some invite companies to show interest; most are a reason to prepare, not to bid yet.
- Contract award notice: the result of a finished procedure. Useful for knowing who wins what and at what price, but closed.
- Change notice: a correction to an earlier notice, often a new deadline. Read it alongside the notice it changes.
Every notice has a publication number in the form 722847-2026. Use it when you talk to colleagues about a tender, because titles are rarely unique.
2. When does it close?
Find the time limit for receipt of tenders, or for requests to participate in a two-stage procedure. Note the time as well as the date, and that it is the buyer's local time. If the notice or the documents give a deadline for questions, note that too. It falls before the closing date, sometimes well before, and it is your chance to have unclear requirements explained.
3. Who is buying, and where?
The buyer's name, its country and its type, such as a ministry, a local authority or a utility. The place of performance is given as a NUTS code, the EU's code for regions, which tells you whether the work is near your teams or a day's travel away.
4. Which procedure?
The procedure decides how much work the bid takes, and when. The main ones in the EU directive are:
- Open: anyone may submit a full tender by the deadline.
- Restricted: two stages. First a request to participate, which proves you meet the selection criteria; then only invited companies submit tenders.
- Competitive procedure with negotiation, and competitive dialogue: for needs the buyer cannot fully specify upfront. Expect several rounds.
- Innovation partnership: for developing something that does not exist yet, then buying it.
Also check whether the notice sets up a framework agreement or a dynamic purchasing system. Winning one gives you a place on it, and the work comes later through call-offs or mini-competitions.
5. What exactly is being bought?
Read the description, then the CPV codes (how CPV codes work). If the contract is split into lots, read each lot's title and value: a lot may fit you even when the whole does not. The notice says whether you may bid for several lots, and how many you can win.
6. How big, and for how long?
Under the EU directive, the estimated value is net of VAT and includes any options and renewals. Check how the buyer has split it between lots, and for a framework, whether it is a ceiling for all call-offs together. The duration tells you whether this is a one-off job or a relationship of several years.
7. Can you take part?
Look for the selection criteria: minimum turnover, insurance, comparable references, certifications and qualifications. Many notices give them in full; others refer to the procurement documents. If one of them rules you out, the directive lets you rely on other companies' capacity, as a consortium or with subcontractors; the documents say how to show it.
8. How will bids be judged?
The award criteria and their weightings: price only, cost only, or price and quality. The balance tells you what kind of bid wins. With price weighted highly, a lean offer wins; with quality weighted highly, method, team and evidence do.
9. Where are the documents, and in which language?
The notice gives the address of the procurement documents, often on the buyer's e-tendering platform, where you may need to register. It also gives the languages in which tenders may be submitted.
What the notice will not tell you
The notice is a summary. The tender documents hold what decides most bids: the specification, the contract terms, the pricing schedule, how quality is scored, and the forms you must return. Once a notice passes the five-minute read, download the documents and check four things before you commit: the contract terms you would have to accept, any requirement you cannot meet, how the scoring works, and how much writing the response needs. Our twelve go or no-go questions take it from there.
Questions and answers
What is TED?
Tenders Electronic Daily, the online Supplement to the Official Journal of the EU, run by the EU's Publications Office. Public buyers in EU countries publish there when a contract is above the EU thresholds.
What should I check first in a tender notice?
The type of notice. Only a contract notice is a call for competition you can bid for or ask to take part in; a prior information notice is an advance warning, and a contract award notice reports a finished procedure.
What is the difference between an open and a restricted procedure?
In an open procedure, anyone may submit a full tender by the deadline. A restricted procedure has two stages: a request to participate that proves you meet the selection criteria, then tenders from the invited companies only.
Is the estimated value in a notice with or without VAT?
Without. Under the EU directive, the estimated value is net of VAT and includes any options and renewals.
What does a notice not tell you?
What decides most bids: the specification, the contract terms, the pricing schedule, how quality is scored and the forms you must return. Those are in the tender documents, whose address the notice gives.
- TED, Tenders Electronic Daily, managed by the Publications Office of the European Union, checked 28 October 2026: https://ted.europa.eu/en/
- European Commission, eForms: digital standard forms used by public buyers to publish notices, mandatory since October 2023, checked 28 October 2026: https://single-market-economy.ec.europa.eu/single-market/public-procurement/digital-procurement/eforms_en
- Commission Implementing Regulation (EU) 2019/1780 establishing standard forms for the publication of notices (eForms), checked 28 October 2026: https://eur-lex.europa.eu/eli/reg_impl/2019/1780/oj
- Directive 2014/24/EU on public procurement: Article 5 (estimated value), Articles 26 to 32 (procedures), Article 33 (framework agreements), Article 63 (relying on other entities' capacity) and Article 67 (award criteria), checked 28 October 2026: https://eur-lex.europa.eu/eli/dir/2014/24/oj